Do not reread the whole guide when you need retention. Cover a few high-risk prompts, answer from memory, then reveal and correct.
Daily 3 — field recall
01Oil decommissioning now always includes which two line items?
Full oil tank removal plus an electric water heater swap. The tank leaves the premises; drain-only is gone.
Review the source →02When can NYSERDA / EFS be used?
Only on qualifying decommissioning jobs through Con Edison Clean Heat. Non-decommissioning jobs cannot use NYSERDA / EFS.
Review the source →03What payment baseline should the 30-minute close use?
The homeowner’s full-year gas or oil bill divided by 12, not a winter-only number.
Review the source →Monthly pitfalls — change-order prevention
01What is the Yonkers solar inspection stop condition?
If solar is pending inspection, HVAC permits must be pulled before install or violations can start at $8,000.
Review the source →02What refrigerant condition blocks keeping existing units on decommissioning?
Existing 410A units must be consultantlaced even if functional; R32 units can be kept and registered if recently installed.
Review the source →03What rooms must be covered for Con Edison approval?
Any room with a door and a bed needs a unit unless the bed is removed or covered to show non-sleeping use.
Review the source →daily 3, monthly pitfalls, consultant review, active recall, quiz, remember oil tank rule, NYSERDA memory check.
Esta página es parte de la biblioteca de capacitación de Bienestar HVAC. Resume el tema Review and retention — daily recall for reps para que el consultor pueda explicar el proceso con claridad, evitar promesas incorrectas y preparar cada oportunidad para una instalación limpia.
Nota para el consultor: use esta página como guía de campo. Antes de prometer reembolsos, fechas, financiamiento o alcance de instalación, confirme elegibilidad, permisos, capacidad del equipo y documentación requerida.